1 / 56
Location Entrepôt 74 m² à 23 306 m²Crossdock Park Guingamp, 15 Impasse Des Buis, 22970 Ploumagoar
Location Entrepôt Ploumagoar 22970
- Directement accessible depuis la RN12, axe stratégique Rennes–Brest
- Rénovation complète en 2024 avec certification BREEAM In-Use « Very Good »
- Reinforced concrete structure, double-skin cladding and multilayer PVC roofing
- Emplacement stratégique
| Espace / Lot | Surface | Durée | Loyer | Type de bien | Disponibilité | |
|---|---|---|---|---|---|---|
| RDC | 11186 m² | 3/6/9 | 48 € HT-HC/m²/an | Entrepôt | 18/05/2025 | |
Logistics platform class A for rent, consisting of 3 units. The logistics platform has been renovated to enhance its energy and functional performance, with the goal of achieving BREEAM In-Use Very Good certification. The renovations included the refurbishment of the roof and the repair of heavy vehicle traffic areas. The site is now equipped with LED lighting, smart meters, and a building management system to optimize energy consumption.
| ||||||
| RDC | 7589 m² | 3/6/9 | 48 € HT-HC/m²/an | Entrepôt | 18/07/2025 | |
The Class A logistics platform for rent, consisting of 3 units. The logistics platform has been renovated to enhance its energy and functional performance, with the goal of achieving BREEAM In-Use Very Good certification. The renovations included the refurbishment of the roof and the repair of heavy vehicle traffic areas. The site is now equipped with LED lighting, smart meters, and a building management system to optimize energy consumption.
| ||||||
| RDC | 3575 m² | 3/6/9 | 48 € HT-HC/m²/an | Entrepôt | 18/07/2025 | |
La plateforme logistique de classe A à louer, composée de 3 cellules. La plateforme logistique a été réhabilitée pour améliorer ses performances énergétiques et fonctionnelles, avec pour objectif la certification BREEAM In-Use Very Good. Les travaux ont inclus la remise en état de la toiture et la réfection des aires de circulation pour poids lourds. Le site est désormais équipé d’un éclairage LED, de compteurs intelligents et d’un système de gestion technique du bâtiment pour optimiser la consommation énergétique.
| ||||||
| 1er étage | 384 m² | 3/6/9 | 48 € HT-HC/m²/an | Entrepôt | 18/07/2025 | |
The Class A logistics platform for rent, consisting of 3 units. The logistics platform has been renovated to enhance its energy and functional performance, aiming for BREEAM In-Use Very Good certification. The renovations included the refurbishment of the roof and the repair of heavy vehicle traffic areas. The site is now equipped with LED lighting, smart meters, and a building management system to optimize energy consumption.
| ||||||
| 1er étage | 74 m² | 3/6/9 | 48 € HT-HC/m²/an | Entrepôt | 18/07/2025 | |
The logistics platform class A for rent, consisting of 3 units. The logistics platform has been renovated to enhance its energy and functional performance, with the goal of achieving BREEAM In-Use Very Good certification. The renovations included the refurbishment of the roof and the repair of heavy vehicle traffic areas. The site is now equipped with LED lighting, smart meters, and a building management system to optimize energy consumption.
| ||||||
| Mezzanine | 498 m² | 3/6/9 | 48 € HT-HC/m²/an | Entrepôt | 18/07/2025 | |
The Class A logistics platform for rent, consisting of 3 units. The logistics platform has been renovated to enhance its energy and functional performance, with the goal of achieving BREEAM In-Use Very Good certification. The renovations included the refurbishment of the roof and the repair of heavy vehicle traffic areas. The site is now equipped with LED lighting, smart meters, and a building management system to optimize energy consumption.
| ||||||
Caractéristiques
Bâtiment
- Divisible
- Espace de stockage
- Accès mobilité réduite
- Année de construction : 2000
- Hauteur sous plafond : 10.01 m
- Quais de chargement : 80
- Parking
Prestations
- Climatisation
Sécurité
- Alarme
Brochure
Télécharger la brochurePlus de pièces jointes
Télécharger la pièce jointeTélécharger la pièce jointeTélécharger la pièce jointeTélécharger la pièce jointeTélécharger la pièce jointeEmplacement
Transports
Guingamp
2 km (soit 18 min à pied)
Gourland
4 km (soit 7 min en voiture)
